Situation A is the typical risk you have to consider. Situation B is also a normal situation but is considered as a criteria of safety or legislative nature.
In your documentation you shall refer to the risks and the source of the risks.
![]() | |||||||||||||
| |||||||||||||
| You are here: opti-pack > 0. Background | |||||||||||||
|